![]() |
![]() |
||||||
|
|||||||
|
Can I leave the Atlas polyiso sheathing permanently exposed to the interior of the building? Previous Screen
No. The sheathing can only left exposed during the initial construction phase, it must be permanently covered by a 15 min. thermal barrier, such as 1/2" drywall or min. 3/8" plywood, prior to occupation of the building. |
|
|||||||||||||||||